AnsweredAssumed Answered

Delay between measurements in AVERAGE mode

Question asked by dimka_upml on Mar 23, 2016
Hi all!

I use scope and measure signal after laser pulse. I connect external trigger from laser to scope. Now I use scope in average mode (25 averages), timebase scale 0.06 sec, timebase position is 4*(timebase scale). In measure subVI I send :DIG to scope and after that in loop send pulse commands for laser (25 times). Before each loop iteration I put wait time (delay) 1200msec. All works good. 

But if I want to change timebase scale, I must change delay in loop to. Help me please to understand how to calculate this delay automatically. MB some formula that connects timebase scale and delay or query or something else?  

Outcomes