AnsweredAssumed Answered

GPIB Command. Is Power Meter Ready??

Question asked by bkundework on Jun 21, 2010
Latest reply on Jun 22, 2010 by Tisfurs
I have an E4419B dual power meter with E9304B probes.  When I turn ON the meter, it takes awhile until the calibration tables have been loaded into the meter.

Is there a GPIB command to ASK the power meter when it has completed reading the calibration tables and it is ready to operate?

What is the best way to do this?

Thanks,
Brian  

Outcomes