Hi,

Could some tell me where are wrong with my transactions that I write in the file attached here. I write and modify the transactions based on the example that I found from PNA help. But got error.

I did manually the setting in the PNA to get the measurement that I want. Then I write the transactions based on the setting.

First I will need to select channel 1. Then select the sweep type for power sweep setting. The start power and stop power for this power sweep setting is -10 dBm. The CW frequency is 2.45 GHz. Then I need to select channel 2 for S21 measurement. Same as channel 1 setting, first I will need to select channel 2. Then select the sweep type for power sweep setting. The start power and stop power for this power sweep setting is -10 dBm. The CW frequency is 2.45 GHz. After That I put a marker for S21 measurement on channel 2. I want to read the data from y-axis. Thanks.


Regards,
Dayah  