AnsweredAssumed Answered

SOLT in E8364B

Question asked by sailfish on Jun 14, 2008
Latest reply on Jun 24, 2008 by dgun
Hi,
I am confused how to design the test structure for 2-port SOLT deembeding in E8364B. For the short standards, can we design the short test structure with port 1 and port2, ground all shorted together, if I want to test CPW trasmission line. Is it the same with just shorting port1 and ground, port2 and ground seperately?
Another question is how the E8364B calculate the 12 error terms for calibration? How can I found the equations?  

Outcomes