AnsweredAssumed Answered

N5230A Cycle TIme

Question asked by ecrean on Sep 9, 2011
HI,

I am trying to determine the triggered measurement cycle time for a 51 point 2-port corrected measurement.  My Span is only 100 MHz.  IF BW can be at
least 360 KHz.  With the display off what is the expected cycle time?  Will the trigger execute both required sweeps, or can I trigger each the forward and reverse sweeps separate?

Thanks,
Ed  

Outcomes