Hi, all,
my version of VEE is 7.51.
Current, my program execuates in the following way,
1) Data process, file generation (Matlab script used, kind of time-consuming)
2) DUT pre-measurement, to determine whether DUT is properly set in the fixture
3)
a) If DUT is correctly set, DUT real-measurement starts (based on the file generated in step 1)
b) If not, program stops
For current version, each time I start the program, it starts with the 1st step to do the process,
and proceeds to the end. If DUT is properly set, it went quite smoothly. But if not, I have to start
again from the very beginning (step 1). While I would like the program to start directly from step 2.
I am wondering whethere there are any settings or Flow control in VEE to realize that?
Your help is appreciated!
BR,
Yiliu
my version of VEE is 7.51.
Current, my program execuates in the following way,
1) Data process, file generation (Matlab script used, kind of time-consuming)
2) DUT pre-measurement, to determine whether DUT is properly set in the fixture
3)
a) If DUT is correctly set, DUT real-measurement starts (based on the file generated in step 1)
b) If not, program stops
For current version, each time I start the program, it starts with the 1st step to do the process,
and proceeds to the end. If DUT is properly set, it went quite smoothly. But if not, I have to start
again from the very beginning (step 1). While I would like the program to start directly from step 2.
I am wondering whethere there are any settings or Flow control in VEE to realize that?
Your help is appreciated!
BR,
Yiliu
Hope this helps.
-mk