Hi there,
i´m trying to program a variegating transient list with two 6812B (i need two phases 120° phaseshift). Each variant to be applied 100 times
At the moment i´m not able to synchonize the two 6812B...
Both transient lists starts at almost the same time (delta is 1-3ms). But when i update the transient list with new parameters, the transient lists are not synchrone anymore. the values are the same, but theres a different timeshift after every transient update. 
I think i have a failure with the trigger, but i can´t solve this problem.

Is there a easy way to synchronize two power supplies?

Thanks a lot for your help.

greets,
Martin

EDIT:

I found out, that sometimes the startpoint of my "Slave" 6812B is a bit earlyer than the "master"...
added some pictures

Edited by: MartinKl on Mar 15, 2012 3:40 AM  