AnsweredAssumed Answered

Help needed in N9038A MXE emi receiver

Question asked by karthik on Apr 17, 2012
Latest reply on Apr 17, 2012 by MikeM
In radiated emission testing, for pre scan measurement (using peak detector) we are keeping measurement time of 20ms and for final measurement (using quasi-peak detector) we will keep it at 1 sec. In SCAN TABLE setting we fix the measurement time for pre scan (20ms). After finishing pre scan we took worst frequencies (close and exceeding limit line) and for that frequencies alone we do final measurement (quasi peak). When using quasi-peak detector we have to change the measurement time as 1 sec. Our doubt is where to set this 1 sec measurement time for final measurement (quasi-peak). Is it possible to run both (prescan and final) parallel by keeping METER on right side of screen.

_ON WHOLE :_
    In the bar graph, how to set the dwell time to 1 or 2 seconds to measure quasi peak.  

Outcomes